← Problems

DEV-003 · Optimal job-shop scheduling

Open

Schedule the 50-job, 20-machine DMU80 instance with a makespan of at most 6620.

Research evidence

Inspect the submitted work or download the evidence and replay the verifier offline.

Download reproduction bundle

No attempts match this filter.

Claims and findings

Contribution credit appears with a verified receipt.